LE PLAN HYDROLOGIQUE NATIONAL ESPAGNOL

 

  • OBJECTIONS TO WATER DISTRIBUTION CONNECTION

By the "Platform for the Defense of River Ebro" (august 2002)

 
OBJECTIONS TO PROPOSED CONNECTION
OF TWC AND TLW WATER DISTRIBUTION NETWORKS IN CATALONIA, SPAIN

Please, complete the following sheet of objections and return them as soon as possible, before the 2nd september 02, preferably to the PDE at: Enric Colome (PDE), Rambla Ferran d'Aragó 22, Tortosa, 43500 Catalonia, Spain (or after the 2nd sepetember, directly to the Catalan Water Agency at: Marta Lacambra, ACA, C/Provença 204-208, Barcelona 08036, Catalonia; Spain).

 

Mr/Mrs/Miss/Ms ........................................ Passport number ...................................
Address ....................................................... Town ....................................................
Postcode ..................................................... Country ................................................

States that:

The proposed plan for the connection of the Tarragona Water Consortium network to the Ter-Llobregat Water network has been published (Diari Oficial de la Generalitat de Catalunya DOGC 3692-05/08/2002). However, in reality if put into effect this would be the National Hydrological Plan's projected water transference from the river Ebro to Barcelona in all but name.
As I believe that this would result in the death of the river Ebro and its associated ecosystem, I would like to offer the following objections.


· There are more reasonable alternatives available for consideration within the river basins of Catalonia.
· The Ebro is a fragile river with a limited, ever decreasing amount of water and it would not withstand any more pressures without its ecosystems being put at risk.
· There are not enough technical and social reasons to justify this water transfer.
· I believe a more acceptable way forward would be to instigate a technical, scientific, and social debate about water management and establish a New Water Culture.

For the reasons stated above I strongly urge that this proposal be withdrawn.

The above is submitted for consideration by the relevant body within the time period stipulated by the official documentation mentioned previously.

Signed :

Date :
Town :

 
 


Back to Iberian Rivers welcome page
Back to Rivernet welcome page
Back to the NHP page